Thursday, May 19, 2011

5-15 Finished calipers; 4 hrs. cleaned and prepared for painting, painted w coats of caliper paint. Installed new seals and stanless steel capiler pistons. on to the master cylinders and new brake lines

Sunday, May 8, 2011

5-8-11 4hrs Seized Brake calipers and master cylinders. These things are a mess. Steps I took to unseize calipers
1 -soaked in a pail of wd 40 for a week
2- put the caliper under pressure in a vice to "crack them free"
3 - connected the caliper to the front master cylinder and "pumped" the calipers out
I am now waiting on the new caliper pistons and the new SS brake lines to come in. I have all the rebuild kits for the front and rear master cylinders and the front and rear calipers

Monday, April 25, 2011

4/25 Reinstalled the wiring harness from the taillight to the headlight. Found out I am missing a many parts for the headlight assembly. 3Hrs

Looked at the calipers, they seem quite rusted and seized, much like an old boat motor that had been sitting in salt water.

Ugh back to the Internet to locate used parts...
4/24 Painted and reassembled the tachometer, speedometer and indicator lights. Installed all new rubber mounts, chrome hardware and decals. Also painted and reassembled the left and right handlebar controls and installed decals. 4hrs

Saturday, April 23, 2011

4-23  She's a rolling!
cleaned and retaped wiring harness, painted dash parts, installed new fuse box, installed motor mounts,  polished chain tensioners, polished and installed handle bars, installed shim on swing arm, installed rear rim with all spacers, installed new grommets on footpegs, installed foot pegs, installed kickstand and spring. 6hrs

Friday, April 22, 2011

4-22 Installed front tire. Looking more like a bike every step! Next I am going to spent some time disassembling, cleaning and painting the gauges, headlamp, and handlebar controls...

4-22 Installed the triple tree, front forks and headlight bracket on the bike. 2hrs



4-22 Polishing front forks; pic is before and after. Wire wheeled the corrosion off the surface then ran on the course buffer with black and red compounds. Finished with white compound on the fine buffing wheel. 3hrs

Sunday, April 17, 2011

Finally it is starting to look like a RD! 1 hr

Engine together. 3 hrs

One Jug On
Started to rebuild engine. Bored 1 size over, new Wiseco piston, rings, wrist pins, roller bearings
Started to reassemble Frame. 3 hrs. The common issue with the frame is that the after market parts dont fit and or are not built quite the same, which makes things time consuming

Friday, February 4, 2011

back into it

benn off a few weeks... bad weather work, etc.  looking forward to the weekend

Sunday, January 9, 2011

Frame Painting

Sanded frame and swing arm with 300 and 500 grit sandpaper. Painted base coat with etching primer and 2 coats of black primer. Applied 2 finish coats of black acryilic enamel and 2 coats of clear. 7 coats in total. 6 hrs

Friday, January 7, 2011

Frame Preparation

Power striped the rust off the frame and swing arm with a wire brush and 3/8 drill and a dremel tool; then power washed the frame. Removed old swing arm bushings. 2hrs

RIMS - Finished Painting

Painted both rims with black sandable primer, two coast of black enamel and 2 coats of clear. Once all was dry I removed the tape and stripped the paint off the cast spoke area of the rim. 4hrs. Rims came out awesome. Installed new bearings and seals

Wednesday, December 29, 2010

Rims - painting

prepared rims with duplicolor cleaner, taped and painted with duplicolor etching primer (2 coats) 4hrs

Sunday, December 26, 2010

Rims -prepping and polishing

Stripped paint from rims with wire wheel and drill. Polished aluminum surfaces by wet sanding with 100, 220, 360 grit; then buffed with black, red and white polishing compound and various buffing pads. 5hrs

Friday, December 24, 2010

Painting and polishing

Researched painting frame and wheels and polishing aluminum parts. Quoted price to have these items done was over $1000. I will now do myself for $200 in materials. See Useful links tab for painting rims using duplicolor paints (youtube) and another link for polishing aluminum (you tube video)
4hrs

Sunday, December 19, 2010

Frame

Spent 3 hrs grinding and prep frame

Saturday, December 18, 2010

Found Carbs and Pipes

Found a used set of DG pipes and 32MM flatside mikuni's on line at the usa2stroke.com forum.  $500, some guy Russ from CA. Nice guy, he use to race back in the day and is also currently starting a daytona project of his own. CA really seems to have more enthusiest for the 2 strokes

Tank Painting quote

Got three quotes for the tank, side covers and tail fin. the price would be to prep, paint, apply decals, and clearcaoat. A freind from the past said $1000, Cafe Customs in Warren RI quoted $800, and guy on the internet in Dallas, with much experience in this area said $700 just for the tank. Al good options. Probably will hold off for now until I get further along with the frame and engine

Powdercoating Quote

got the quote back for powdercoating the frame, engine parts, and rims. looks like about a $1000

Thursday, December 16, 2010

Day 1 of the project

12-17-10
Day 1 of the restoration project of a 1979 RD400f Daytona Special. I am excited!  I bought this basket case on ebay for $800. The irony is I purchased this bike new for $1800!

I figure it will take me about $3,000 to get to decent condition lets see! My current plans are the bore it one size over, new paint and decals, powder coat all the black parts and frame, rebuild the brake systems, new tires, new seat cover, new chain and sprockets. An yes many new nuts and bolts (i think I am missing a few). Also new pipes, carbs and airfilters, and some electrical parts